IntegrateSun
- 1 area served
What IntegrateSun customers say
Liz Hastings
Reviewed on Sep 28, 2026
Battery Installation only
The process was confusing. I am thankful for the patience and explanations to help me understand what was going on. The installers worked quickly and neatly.
N/A
Reviewed on Sep 23, 2026
great
Installation went smooth
Paula Johnson
Reviewed on Sep 18, 2026
Yes, I’m writing this review about my experience with working with the solar solutions. The process has been very well. Lots of information weekly calls about the progress so that was very enlightening. We’re at the end and everything has went very smoothly. The installers were very professional cleanup was wonderful. I couldn’t say anything bad about this experience and I appreciate the whole team for all their hard work. Paula Johnson
Elizabeth
Reviewed on Aug 12, 2026
Great to work with
We've had a great experience with IntegrateSun. From our sales person to our point person, Lilly, they were all wonderful. Lilly kept me informed about our progress often and answered any questions I had. Our panels were installed in one day and we were up and running that night.
Eugene Rancho
Reviewed on Aug 9, 2026
Colorado Springs’ high altitude results in intense sunlight, even on cooler days. The team explained how these conditions could benefit solar production and sized the system accordingly. They also handled the entire Xcel Energy setup for us. Six months after installation, we have barely paid anything to the utility company. Choosing solar was a very solid decision.
Kidd
Reviewed on Aug 7, 2026
Great Service!
I live in the Maryland, Aryan was my project manager and he was very communicative throughout the process. The panels look great highly recommend. Their price was very competitive!
Eric Washburn
Reviewed on Aug 4, 2026
Good experience with IntegrateSun
We hired IntegrateSun to install a 9.9kW solar sustenance at our home in Colorado. They did a nice job. Their team was highly professional and enjoyable to work with. I am happy to say that we are delighted with the result.
Harold Gyani
Reviewed on Jul 29, 2026
After retiring, we moved to Nevada for the weather and low taxes. Installing solar seemed like the next logical step. The NV Energy interconnection process moved quickly. I especially appreciated that the sales representative was not pushy, particularly after we had dealt with several aggressive companies. The system now covers approximately 95% of our electricity usage, which is better than we expected.
Shella Parker
Reviewed on Jul 28, 2026
Harrisburg has its share of cloudy weather, but our system produces more electricity than I expected, even on overcast mornings. The PPL interconnection took approximately two weeks. The installer also explained how solar panels continue generating electricity on cloudy.
Rosa Else
Reviewed on Jul 28, 2026
We are a Spanish-speaking household, and the representative who visited us spoke fluent Spanish. This made my parents feel extremely comfortable throughout the process. SMUD also has favorable solar policies compared with several other California utilities. The installation was clean and completed in approximately a day and a half. We have experienced consistent monthly savings since the system was activated.
Evelyn Trayler
Reviewed on Jul 28, 2026
Living the Southern Maryland commuter lifestyle means we are rarely home during the day, but our house still consumes a significant amount of electricity. Solar generates power throughout the day while we are at work, which is perfect for us. The BGE interconnection took approximately three weeks, and we have been rolling over electricity credits every month. We are very happy with the results.
Pamela Smith
Reviewed on Jul 28, 2026
Solar systems were starting to appear throughout our neighborhood north of Houston, and we did not want to be the last holdout. We are glad we finally made the decision. The CenterPoint interconnection took approximately three weeks. The installation crew was respectful of our property, and even my dogs had stopped barking at them by the second day. We are now saving more than $200 per month.
Horacio Rodriguez
Reviewed on Jul 25, 2026
Integrate Sun solar panels
Integrate Sun did an excellent job in the installation of the solar panels and the Electric car charger. They installed a new control panel and wired the electricity out to my gate for a gate opener. They completed all the work in the contract and cleaned up once the installation was completed. The crew did a very good job in communicating the daily progress and kept me updated throughout the process.
Joanna Fank
Reviewed on Jul 25, 2026
I rent out the basement unit of my Washington, DC row house, and the tenant's electricity usage was reducing my rental income. Going solar completely changed the numbers. The team handled the Pepco setup professionally and understood the District's permit requirements inside and out. The entire project, from signing to activation, took about six weeks, exactly as they predicted on day one. My total electric bill for both units combined was $22 last month. The rental income finally makes the sense it should. I wish I had done this three years ago when I first bought the house.
Rosalie Daniel
Reviewed on Jul 24, 2026
My parents always told me to invest in things that pay you back, and this system is exactly that. Duke Energy net metering means credits roll over from month to month. The installation crew was polite and thorough. My system has been live for ten months, and I have paid the electric company a total of only $67 during that entire period. That amount used to be less than a single month's bill.
Anita Jack
Reviewed on Jul 24, 2026
Our Ventura County location receives good sunshine throughout the year. Southern California Edison interconnection took about three weeks, which is fairly standard for this area. The panels are producing well, our bills have dropped significantly, and the team remained courteous and professional throughout the project.
Phillip Micheal
Reviewed on Jul 24, 2026
This was our second time using IntegrateSun. They installed solar on our previous house in 2021, and when we moved, we called them again without even getting another quote. That is the best endorsement I can give. We received the same professionalism and quality workmanship, and the Georgia Power interconnection was handled smoothly again. If you are on the fence, make the call.
Constance parker
Reviewed on Jul 24, 2026
I will be honest: I was nervous about signing a contract for something this expensive. I asked many questions about warranties, equipment guarantees, and what would happen if the company ever went out of business. They answered every concern without making me feel difficult. NV Energy approval came through quickly. The system has been live for seven months, and everything is working exactly as described. The nervousness is completely gone now. I feel satisfied every time I check the monitoring app.
Bobby R
Reviewed on Jul 24, 2026
This was a typical Dallas-suburb home with nothing particularly complicated. The installation went smoothly, Oncor approval was quick, and the savings have been good. It was exactly the straightforward experience you want from a solar project.
In Grid
Reviewed on Jul 23, 2026
We have a split-level home with three roof sections positioned at different angles. Another company told us the roof was too complicated. IntegrateSun sent a different type of assessment team, spent two hours on and around the roof, and returned with a design that used all three sections intelligently. Enphase microinverters made the multi-angle setup work because each panel operates independently. Pepco interconnection took 14 days. We are generating more than originally estimated because the east- and west-facing sections capture morning and afternoon sun. Sometimes a complicated roof turns out to be an advantage.
Barry
Reviewed on Jul 23, 2026
Solid installation from start to finish. The team handled the Xcel Energy rebate processing, the system is performing well, and the savings are real. I would recommend them.
Harry
Reviewed on Jul 23, 2026
Border region sun is intense year round and I cannot believe I waited this long to go solar. EPE interconnection was handled entirely by the team without me lifting a finger. My electricity cost last month was nine dollars. I'm going to let that sink in for a moment. Nine dollars. Before solar I was paying close to $300 in summer. The crew was professional, bilingual, and finished ahead of schedule. My parents live with us and my mother made tamales for the whole crew on day two. They came back the next morning and she had more waiting. Good people doing great work.
Nathaniel
Reviewed on Jul 23, 2026
Moved from up north, where solar did not make as much financial sense. Down here, with the amount of sunshine and Duke Energy rates, it was a no-brainer. The process was smooth from start to finish, and the crew completed the installation in one day. Interconnection took about two weeks. The system has been running for five months and is performing exactly as promised.
Doli
Reviewed on Jul 19, 2026
local guide
Living in Scottsdale means we have the AC running from April through October without a break. Our SRP bills were consistently over $380 in peak summer. My neighbor across the street installed solar two years ago and I watched her bills drop in real time before finally making the call myself. The consultation was on a Saturday morning which worked for our schedule. They designed a system specifically around our summer peak usage which I appreciated. Installation took two days because of our tile roof but the crew was careful and experienced with that type of work. SRP interconnection moved in about two weeks. First summer with solar and our highest bill was $31. Thirty one dollars in July in Scottsdale. That tells you everything you need to know.
Robert
Reviewed on Jul 18, 2026
My wife handles all the home improvement decisions and she is not easy to impress. She had a list of nine questions prepared for the consultation. By the end of the meeting she was the one asking when we could get started. That should tell you everything. Georgia Power approval came through faster than expected and the installation itself was done in a single day. The crew even introduced themselves individually before starting work which was a small thing that made a big impression. Eight months of near-zero electric bills and one very impressed wife. I'll take it.
Eric Cooper
Reviewed on Jul 15, 2026
3rd update. Aahil and Massie fixed everything. They fast tracked everything and got the system installed. Permits all went through with flying colors. Utility is super slow. Not integratesuns fault on that. It's a big project and they fixed all the hiccups and I am very pleased with my fully functional 22kw solar system. Big thanks to Aahil for streamlining everything. Ok review update. Will update again later. The sales director and partner corrected my project and rushed getting the parts out and had the installation crew finish the job in about 3 days total over 1 week. Keep in mind the winter weather was an issue. The installation was well done and the system is live but pending final inspection with the utility. If everything goes through I will update to 4/5. Another update. Had a panel stopped working. Faris from integrate sun dispatched a tech and had it replaced and fixed in a week. Great service.
Kevin M
Reviewed on Jul 3, 2026
Rocky start with issues with system being too big for grid/transformer in the local area. Utility approval was hard to get with weeks waiting between submitting redesigns with issues filing the paperwork. I basically had to step in to push the project along with the utility and ask the utility what will it take to get approval. Eventually had to modify design to include batteries. Aryan Lee finally took over and got the project moving along a lot quicker. Once we got approval, there were delays with procurement as there was a lot of demand. At one point, we got another projects panels before we had utility approval. They had to send someone to pick those up and redeliver those panels. Once we got our correct panels we were scheduled for install which took 2 days to finish. A team had to come back out to fix a couple issues from inspection. Also, had lots of issues with the Powerwall 3 which likely was a dud. Fortunately, it wasn't difficult to have the install team come out to troubleshoot and repair the system. Unfortunately, had to spend the last several months with intermittent solar generation with the problematic Powerwall 3, it took about a couple of months before it just died. Eventually they got the replacement Powerwall 3 installed. Its been almost a year between initial quote from Solar Sage and PW3 replacement. Although the timeline has been way past original estimates, the original quote was quite competitive for cost per watt. I ended up paying more with changes but got a decent price for what the system has. Overall a long road to get to here but eventually came out great with Aryan Lee as project manager.
Jeena Cherian
Reviewed on Apr 29, 2026
I was looking for a family owned solar company and had such a great experience working with IntegrateSun. From the start, their team was very responsive and easy to talk to, and they really took the time to walk me through everything without making it feel overwhelming. You can genuinely feel how much they care about the people they work with. It never felt like I was just another customer. They were patient, answered all my questions, and made sure I felt comfortable with my decision. I would absolutely recommend them to anyone looking for a team that truly puts their customers first.
About IntegrateSun
- 114
- Customer reviews
- 4.4
- Average rating
- 1
- Area served
What IntegrateSun does
Services
- Installation
Where IntegrateSun works
- Texas
Where to find IntegrateSun
Head office
5821 Southwest Freeway #320, Houston TX, 77057