Office location: 1785 Industrial Park Avenue Building A, Redlands CA, 92374
12/17/2022
Dan
Laguna Niguel, CA
Several folks to thank for their talents and drive for results. Project Status is Waiting for City Sign-Off, which is why my some of my review is in the present tense. Wade - My design engineer has been awesome. Collaborating on the original design. Wade continues to help me understand as questions about my system and emerging regulations come up. Rose - My Project Manager continues to keep me posted on the project timeline. She makes herself available for my questions. She takes the initiative to reach out and follow up. I can only imagine the workload driven by the demand in California. The Red Team - Installed my system. Very neat looking job. These guys were courteous and always cleaned up after themselves. Protected my gutter using a gutter guard. Jason did a great job setting up the hub and battery. The new panel is neatly laid out and labeled.
System size (kW): 13
Year installed: 2022