*Update April 2023<br /><br />Equipment is now functional and running perfectly since 1/18/23 (over a year to install!)<br /><br />In March I generated 1.1 MW hours and exported 806 kW hours to SCE. My house is 95% off the grid on most days.<br /><br />Love the Enphase equipment and the final result. Just beware that battery systems are not easy installs. And now that NEM 3.0 is in place you are not going to get the same payback.<br /><br />However, just the fact that I’m only 5% reliant on SCE makes me satisfied. So ultimately worth the pain and frustration.
System size (kW): 13000
Year installed: 2022