06/19/2019
Gary
Solar was installed and inspected in 3 days. City permit inspection took a full day to schedule or the job would have been done in 2 days! Monitoring in line was done quickly and the panels are producing beautifully. I did add the charge point (level 2 charger) and am looking forward to using it. All of this was installed on my clay tile roof with all tiles that were damaged being replaced.