09/23/2013
Anonymous
212 Develin Drive, Phoenixvill 19460-1517, PA
In 2010 Solular,LLC did a 10Kw ground installation finished in August 2010, In October 2010 after a rain, more than 50% of the concrete footers sank up to a half-foot. The installation was NO longer level, straight or NON-Wavy panels.<br />Two years later I advised them that a Slar Panel was discolored, a Junction box broken by the upwards press from the sinking array. The promised to fix it, NOW in September 2013 I still have the same conditions. The grunts were nice, the engineering questionable and the 'Principles' (Long's) downright nasty!