09/08/2011
Hank Hartman
Installation delayed due to SRP as meter was behind a gate. This was resolved and the contractor arranged to install as a priority. Great effort.<br /><br />Documentation and training lacking on the monitoring system.<br />Communication with contractor support was excellant.