01/19/2018
Anonymous
Lightwave Solar did it all for me. Matt Duncan came out and measured the amount of electricity I should be able to produce based on the roof and the trees which would impact the solar electric production. They walked me through the TVA and power company paperwork, doing over 95% for me. The installation crew was very professional. They were very respectful of our property and our privacy. Each installer wore safety harnesses while on the roof and took precautions when moving about and climbing up and down the ladder. One afternoon they had to stop because the wind made it unsafe to handle panels. All in all, the installation took about 5 days. The comissioning took about two hours. We immediately started producing over 10 MW of power. Our commissioning was Nov. 28, 2017, and ut to Jan 19, 2018, we had produced over 1.64 MWh of electricity. I consider that very good for this time of year with all the rain and snow and cloudy days. My wife and I are very pleased.
LightWave Solar reply
01/26/2018
Wow, thank you for the wonderful and detailed feedback. Makes our team members proud and very helpful for those considering an installation.