Start and completion of work were delayed by the storms we had and the difficulty in scheduling the inspection of the work at various stages by the City.<br />Corrections were required by the City since the natural gas line had to be relocated due to its original proximity to the power panel. When the gas line had to be relocated, several line connections were loosened and it required time to locate and resolve the line leaks so it would hold a 15 psi pressure indefinitely.