05/13/2008
Dan Savin
Only one glitch. The size of the existing electrical box was miss-judged. However, Standard Solar absorbed additional upgrade costs.<br />All the personnel at Standard Solar were very cooperative and pleasant with which to work. Only comment is that it seemed to take longer than expected to get permits and inspections performed. But that may have been because they are from a different county and were not familiar with local county protocals.