Review for Pacific Solar Energy

01/14/2008
Don Coleman

My system was installed in 1998 (by a different installer)-- this project was to convert the system from having batteries (for backup), to not (the batteries had died). It involved converting from a 48V system, to a 200+V string inverter. I live in Spain, so all communication was remote/international, and I`m very happy with the result.<br />My system was originally installed in 1998 ...

Sales process
Price charged as quoted
On schedule
After sales support