09/18/2017
Anonymous
SmartEnergy took more than 5 months to install my system. It took even more to have my production registered by LADWP. At the first installation they left 2 wires out, which means I was producing half the energy until another technician who was working on another problem found out about it. Lately, they stopped answering back my calls or emails. No wonder SunPower dropped them.