03/07/2014
Anonymous
Jason and Dillon were both attentive and followed through well.<br /><br />Even with poor weather at times, the system was installed with minimal delay.<br /><br />Longest waiting time was on CPS. But once CPS swapped meters, the system came on and has covered our electrical needs the past four days. <br /><br />Can't wait until summer approaches and the resulting power generation lowers our electric bill.<br /><br />eGauge is pretty cool. Being able to see the system come on and outpace the power need is priceless.