San Diego, CA
San Diego, CA
Three weeks after contract signed, they determined that my electric panel was not adequate and I needed to spend another $2K on a 200 amp panel. I had another electric contractor check it out, and they determined that existing panel was adequate. It then took C M another three weeks to conclude that they were wrong. When they did the installation of panels, they broke more than 50 cement tiles on my roof, but they did replace them once confronted with the damage their installers did. The tile replacement took place after the city and SDGE had approved the solar installation; and their workman switched off the solar (on the roof) when they did their replacement work. They FORGOT to turn it back on and I went two more weeks without any solar power. Very bad workmanship enabled by bad management! Avoid them like the Plague ! !... read more
Type: Residential Electric
Reviewed: 06/05/2016
The information on our website is general in nature and is not intended as a substitute for competent legal, financial or electrical engineering advice. Reviews on this site do not reflect the views or opinions of SolarReviews or its directors or shareholders, nor an endorsement of any third party company. We make no representation as to the accuracy of the information entered by third parties. We disclaim any liability for any damages or loss arising from your use thereof.
Sitemap Privacy Policy Do not sell my details Terms of Use For Installers Register Login
Copyright © 2012 - - solarreviews.com. All rights reserved.